Requirements

The client required an additional facility on their site for use as a manufacturing workshop. After surveying the site and gaining an overall understanding of the client’s objectives HTS proposed one if its L- Series temporary warehouse building as the best solution to the requirement.

Solution

HTS manufactured and installed a standalone structure a 20.00m x 30.00m modular building with an eave height of 5.20m fitted with our energy efficient thermo roof system.

This modular building was equipped with 40mm composite sandwich panel walls, 2 x manually operated roller shutter doors and 2 x personnel door units, 1 x external gutter system with downpipes.

The client was extremely satisfied with both the modular building and excellent service that they have selected by HTS  as their preferred supplier for any future purchases of temporary warehouse buildings.