Requirements

The client, a leading European palletised freight distribution company had an immediate requirement for an additional facility to accommodate materials handling maintenance workshop. The new workshop needed to blend with the client’s existing site colour scheme. To achieve this HTS liaised with the landlord and supplied a colour matched wall panel for the new temporary warehouse building.

Solution

Utilising existing space and ground surface at the client’s facility HTS installed a 10.00m x 10.00m L-SERIES Thermo insulated building with a 4.20m eave height.

The modular building was fitted with RAL 7035 light grey thermal insulated layer roof covers and gable triangles, robust corrugated single skin steel cladding walling in RAL 9006 (white aluminium), 1 x manual roller shutter door, 1 x personnel door and a complete external gutter system.

The temporary warehouse building supplied by HTS was an extremely cost effective solution that met the client’s needs perfectly with the minimal of disruption at their distribution site.

Enquire about this product